how long it takes to replicate 810GB , over a 4Mbit/s WAN link --- Veeam / VMWare
here is a theoretic calculation
810*1024*8/4/60/60/24= 19 days
here is a theoretic calculation
810*1024*8/4/60/60/24= 19 days
my rant about generic IT issues/topics in daily work/life. no attempt is made to its accuracy. no liability assumed. This blog has No connection with any workplace.